Author |
Manuscripts |
Anna Kadefors
Chalmers University of Technology
|
166 ORGANIZING COLLABORATION IN CONSTRUCTION PROJECTS – FORMAL MODELS MEETING PRACTITIONER PERCEPTIONS
|
Kalle Kahkonen
VTT Technical Research Centre of Finland
|
202 HEURISTIC SOLUTION FOR RESOURCE SCHEDULING FOR REPETITIVE CONSTRUCTION PROJECTS
|
Kars van der Kamp
Hogeschool Utrecht
|
100 THE RISE OF THE ZZP’ER (SELF-EMPLOYED PROFESSIONAL) IN THE CONSTRUCTION INDUSTRY
|
Hamed Kashani
Georgia Institute of Technology
|
158 A REAL OPTIONS APPROACH TO EVALUATE INVESTMENT IN SOLAR READY BUILDINGS
|
Atsushi Kawasaki
Misawa Homes Inc
|
146 MAIN: SUSTAINABLE CONSTRUCTION FOR INDUSTRIALIZED DETACHED HOUSE, SUB: ROLE OF RESOURCE RECYCLE FACILITY
|
Yongjian Ke
National University of Singapore
|
13 DIVERSITY MANAGEMENT: MANAGING MIGRANT CONSTRUCTION WORKERS ON CONSTRUCTION SITES IN SINGAPORE
|
Graham Kelly
Loughborough University
|
8 IMPROVING THE DESIGN OF ADAPTABLE BUILDINGS THOUGH EFFECTIVE FEEDBACK IN USE
|
Andrea Parisi Kern
Unisinos
|
106 BUILDING RENEWAL ON SOCIAL HOUSING – CASE STUDY ON THE RUBEM BERTA SETTLEMENT, PORTO ALEGRE, BRASIL
|
Christian Koch
Aarhus Universitet
|
109 DRIVING SUSTAINABLE INNOVATION IN CONSTRUCTION COMPANIES
|
Jelle Koolwijk
TU Delft
|
251 CHAIN COLLABORATION BETWEEN A HOUSING CORPORATION AND TWO GENERAL CONTRACTORS, THE FIRST STEPS
|
Bartosz Kostrzewa
Warsaw University of Technology Civil Engineering Faculty
|
188 THE TIME-COST ANALYSIS OF THE CONSTRUCTION PROJECT, TAKING INTO ACCOUNT RISK BASED ON EXPERT KNOWLEDGE USING FUZZY SETS
|
Ioanna Kougia
University College London
|
73 LOCALISING THE SUPPLY CHAIN
|
Saso Kovacec
University of Maribor, Slovenia
|
168 MODEL OF ECONOMIC JUSTIFICATION OF CONSTRUCTIONS' RENOVATION
|
Robert Kroese
Delft University of Technology, OTB Research Institute
|
33 EMBEDDING ENERGY SAVIING POLICIES IN THE DUTHC NON-PROFIT HOUSING SECTOR
|
Matthijs Kuhlmann
Hogeschool Utrecht
|
105 STIMULATION OF PROJECT COOPERATION BY PROCUREMENT PROCEDURES AND PROCUREMENT CLIMATE
|
Janusz Kulejewski
Warsaw University of Technology Civil Engineering Faculty
|
190 CONSTRUCTION SCHEDULING WITH IMPRECISELY DEFINED PLANNING CONSTRAINTS
|
Mohan Kumaraswamy
Centre for Infrastructure and Construction Industry Development, Dept. of Civil Engineering, The University of Hong Kong
|
50 USING ‘WHOLE LIFE CYCLE VALUE’ TO EVALUATE INFRASTRUCTURE MEGAPROJECTS
45 FOSTERING AN ENVIRONMENTALLY RESPONSIVE INDUSTRY – A PUBLIC SECTOR CASE STUDY FROM HONG KONG
|
Juliane Kurschner
Municipality of Amsterdam, Spatial Planning Department
|
118 THE AMSTERDAM GUIDE TO ENERGETIC URBAN PLANNING
|